|
| One of the more involved aspects of the project was to remove the existing concrete panels that form the driving surface of 14th Ave NW. Because of the geometry, the panels had to be re-poured to maintain strength and integrity. | |
| Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | | |
|
|
| 18 Images | Generated by JAlbum 6.5 & Chameleon skin | Help |